Nearly half of planned US data center projects are being delayed or canceled right now, and the cause isn't a shortage of chips, it's a shortage of the large power transformers and switchgear needed to actually energize a site, with new-equipment lead times running two to four years and the bulk of that hardware imported. A developer with capital and a signed lease still can't get power equipment fast enough to hit their timeline.

This product is a marketplace and leasing operation that sources, refurbishes, tests, and leases large power transformers and switchgear to data center developers stuck behind those OEM queues, instead of requiring a multi-year capital purchase commitment on brand-new equipment. It works by finding equipment utilities are retiring or that exists in secondary markets, running it through a rigorous refurbishment and testing pipeline, and leasing it short-term to developers who need power online now, not in 2028.

The wedge is one equipment category, transformers specifically, since that's the single worst bottleneck in the chain, and one region, building a reliable sourcing and refurbishment pipeline there before expanding into switchgear, backup generation, and additional geographies.